Watson Batty Architect have successfully delivered a new
60,000 sq. ft. gross Morrisons store in the heart of Blyth Town centre. The Blyth store is one of
the first in the North East to be designed around Morrisons ‘Store of the
Future’ concept and aims to deliver an innovative fresh food offer
which is not available elsewhere while still maintaining great value. The store
includes new misting technology which is used to optimise the freshness of the
food on offer in the ‘fresh market’ which will stock everything from carrots to
tinkerbell peppers and yellow courgettes. The store also includes a continental
style deli counter, 140 cuts of meat in the butchery and an unrivalled
selection of more than 80 cheeses from the UK and around the world. At the bakery
there will be up to 48 varieties of bread baked fresh from scratch throughout
the day by Morrisons bakers.
14/02/2013
New Morrisons Store Open at Blyth
24/01/2013
Successful 1st PassivHaus air tightness test at the STEM Building
GB Building
Solutions are currently under way with STEM Bradford
at The University of Bradford which commenced in September.
The project is
progressing quickly onsite leading to the buildings first of three air tests.
To meet the PassivHaus requirements the building must not leak more
air than 0.6 times the house volume per hour (n50 ≤ 0.6 / hour) at
50 Pa
(N/m²).
Onsite testing showed that the building exceeded the requirements and takes the
project a step closer to full accreditation.
The demanding project is on track to deliver the University of Bradford ’s
first BREEAM ‘Outstanding’ and PassivHaus accredited educational building in
early April.
21/01/2013
Planning submitted for the Calverley Building Refurbishment at Leeds Metropolitan University
In mid-December Watson Batty submitted a planning application to
refurbish the Calverley Building at the Leeds Metropolitan University city centre campus. The project is
split into 3 phases with a total estimated value of £8
- 12 million. Phase 1 involves the provision of new toilet accommodation within
the building and the creation of hub rooms and service risers within the
adjacent Portland building.
Phase 2, for which
the planning application has been submitted, involves the repair and cleaning of the
concrete structural frame, replacement of all windows from levels 02 to 10 and
the rendering of the lower part of the building referred to as the ‘Plinth’.
Phase 3 of the proposals will include a phased internal refurbishment of the building. We hope to be out to tender early February with initial works
commencing in June this year.
20/12/2012
First Project Completed at Leeds Metropolitan University
As part of our on-going work at Leeds Met University we have
completed an interior project at the first floor of the Universities City
Campus library. The project involved rationalising three floors of reprographics
space into one in order to provide additional individual and group study
spaces. New fixed and ‘quick visit’ IT space has been provided with a varied
selection of furniture to give students greater choice. An interior design scheme with new lighting has also made the space more welcoming and functional.
13/12/2012
WBA Double Award Nomination
Watson Batty Architects have had not
1 but 2 recently completed projects nominated for the York Design Awards –
‘Peoples Award’ hosted by the York Press. WBA’s work at Our Lady’s RC Primary
School and the refurbishment of the Fountains Learning Centre have been well
received and we are delighted that the success of the projects has been
recognised through the nominations.
To register your vote and support
please click the link below:
07/12/2012
Watson Batty Client Evening
Watson Batty would like to say a big thank you to all that attended our annual client evening which took place on Thursday the 29th of November in our Leeds office. The evening was well attended and a great success.
We would like to say a special thank you to Philips Lighting who did a fantastic job at lighting the exterior of the Watson Batty Office on the night. Watson Batty have been working closely with Philips Lighting over last few months designing the external feature lighting at the (recent planning approved) University of Huddersfield Student Learning and Leisure Centre. For more details on the products and features provided by Philips see www.philips.com
12/11/2012
Curtain Goes Up On John Leggott College Performing Arts Building
The new Performing Arts Building for John Leggott College
opened it's doors to welcome students this Autumn. The state of the art facility
provides a range of dedicated teaching, learning and performance spaces,
including specialist acoustic practice and technology spaces. Watson Batty
Architects were appointed by the contractor to complete the design and support
the project through to completion. We are delighted to be involved in this high
profile project for the College.
Morrisons Blyth Progressing Well
With the stores envelope practically complete, McLaren
Construction, are now focused on undertaking the internal fit out and second
fix of the services as the milestone of mains power is completed this month to
the store.
On completion of the works, due January 2013, the existing
stores staff will transfer to the new store and the existing Morrisons building will be
demolished to make way for additional car parking and
Section 278 works. The external works and new access in the redeveloped site are due to complete in summer 2013. The new store will create an additional 200 new jobs
for the local area and forms part of the Blyth town centre
regeneration programme.
Watson Batty Architects will be working closely with all
involved in the construction phase to ensure a successful delivery of the store
Subscribe to: